At Railings-Glass, installation is an essential step in guaranteeing the safety, stability and aesthetics of your guardrail. Each installation follows a precise, standard-compliant procedure.
Installation steps
1. Site preparation
Before installation :
- Check surface and levels
- Prepare supports and fasten profiles (dimensioning)
- Check dimensions and plans validated at time of order
2. Installation of supports and profiles
- Precise alignment and fastening according to layout and study
- Checking the rigidity and stability of supports
3. Glazing installation
- Safe handling with suction cups and special tools
- Insertion of glass into profiles according to validated layout
- Checking gaps and alignments
4. Fixing and adjustment
- Installation of fasteners, plugs and accessories
- Final verification of verticality and alignment
- Adjustments in accordance with measurements validated at time of Ordering
5. Quality control
- Final inspection for stability and compliance with standards (Warranty)
Additional resources